Main phases of repair in the apartment.
How to start repair of the apartment?
The very first phase of the repair work of old homes is the damage and dismantling first of all of the worn out walls and partition walls, getting rid of the wall and ceiling coating. This stage is one of the most "dirty" phases of the repair work.
One more amongst the most important and "dusty" works is the window block replacement. It is necessary to do this firstly since dirt and dust will be unallowable during following stages and it is prohibited at all to open windows during painting and wallpaper works (large drops of the temperature level and moisture are unallowable). After installing windows and windowsills it is essential to load them immediately in polyethylene movie and to cover windowsills in addition by the fiber board (in order to avoid scratches).
The following phase is electrical wiring. Electrical wiring can be installed in walls or along the floor. Electrical wiring is made inside the pipes to guarantee electrical security and boost reliability. The pipe secures electrical wiring from external damages and enables to change the wire entirely without breaking walls and flooring simply by inserting the brand-new wire instead of the old one.

Later on the system need to be ready to service in case of failures. In addition to the circuitries, the telephone cable and the TV cable television are set out. The power cable must not be laid out near the telephone and antenna cables to avoid noise pickup and disturbance. The most strange moment is setting out the TV cable. In order to make 2 (or 3) TV sets in the apartment or condo the second cable is frequently merely "strongly soldered" in parallel, so the cable television resistance is lowered. As a result, the display quality is degraded, numerous programs can't be gotten and etc. In order to avoid such circumstance it is essential to invite a specialist with unique devices. He will measure the signal level of the each TV-feeder and set up TV-amplifiers or TV-filters.
Painting is the most long-lasting process, that is why it is conducted concurrently in all facilities, if it is possible. Hold-ups are related to the innovation. Each used layer of the plaster (or filling in completing) need to dry entirely before the work will continue.
Works in hygienic plans and the cooking area begin all at once with house painting. It is better to satisfy so-called "filthy" works in the top place and all at plumbing repair article once. In accordance with the plan of the sanitary specialist place welding, wall chasing and pipe run are carried out. Steam radiator admissions are prepared, taps and brackets are mounted, however radiators are not installed.
Then works in hygienic arrangements are performed according to the strategy. The bath is mounted, then walls are smoothed out and the tile is laid on walls. The list below stage is assembling ceiling and laying tiles on the floor. And at last other sanitary gadgets, mixers and accessories are mounted.
After electrical wiring, setup of rosette plates and terminal boxes the voltage is signed in all point. Ends of circuitry are insulated and laid out into rosette plates. Sockets and breakers are not set up throughout this stage in order to save their surface area appearance. The surface puttying of walls is performed simultaneously. The highly exact control of drying of the layer of the plaster (filling) is carried out by drymeter. It is an unique instrument that measures moisture of the material.
The following phase is the procedure of fill. Fill can be made with various products-- from typical masonry cement-sand mixture to self-aligning floors. The advantage of the basic mix is its cheapness, the downside is that such mixture is much more difficult aligned at the level and the last dry time of such fill is 40 days, just then the next stage of the deal with flooring can be performed, i.e. the period is too long. Self-leveling self-aligning floors are much more costly, however more technological. Lining up occurs almost "immediately" i.e. fluid option of mixture is put out, then it runs and you receive the horizontal surface area. The final dry time is 15 days i.e. you have significant time economy. The system "warm flooring" is set up into the fill. If the so-called "damp processes" are inapplicable the innovation of the dry aligning (the fill technology) is utilized bases for floorings with adjustable floor battens are mounted.
After fill door boxes and door are installed. Setup of doors must take into the account density of future floor covering. After setup the door can be taken off its hinges and got rid of until the end of repair or loaded into polyethylene film to protect from damages. Concurrently ceiling can be painted and the tile can be laid in that properties where it was prepared. The tile needs to be laid on the absolutely dry overlay.
Finishing of the flooring installing depends upon the planned covering. For the most part (if finish covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are repaired to the flooring by self-tapping screws. One plywood sheet is repaired by 30-50 self-tapping screws to provide the close fixing of plywood and long-lasting service of the floor without squeak and bulging. The plywood provides the additional heat- and acoustic insulation. After mounting of the plywood is ended up, wallpaper for painting can be pasted on walls.
In premises where finish covering of the floor is laminated flooring or parquet stockpile, the ordinary wallpapers are pasted (not for painting) in the first place. Then the flooring covering is mounted.
If surface covering of the flooring is the block parquet, the parquet is laid in the top place, then it is scraped and covered by one layer of lacquer. After this the ordinary wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending upon the quality of the parquet and lacquer). The discussed repercussion is connected only with such scrambling process when the excellent amount of dust is developed. In spite of the fact that good floor mills are equipped with the vacuum cleaner, the enough amount of dust is precipitated on surrounding topics including walls. Dust is really acerbic and is badly cleaned off. That is why in order not to harm wallpapers, they are pasted after rushing and in order the parquet do not soak up the surplus moisture it is covered by the one layer of lacquer before wallpaper pasting.
After this the primary works can be thought about to be ended up. It is left just to set up the plinths, decorative elements, breakers and sockets, curtain holders, to hang doors, plant-bands and others.
In conclusion it is essential to note that the sequence of works was noted in basic and can change depending upon the guaranteed scenario-- the variety of rooms in property, your resources, peculiarities of the building of the multilevel premises. It is based on good sense and every person efficient in analysis can individually create such a series.