Main phases of repair in the house

Main phases of repair works in the apartment.

How to start repair of the apartment?

The first stage of the repair work of old houses is the damage and dismantling first off of the worn out walls and partition walls, eliminating the wall and ceiling coating. This stage is among the most "unclean" stages of the repair work.

One more among the most important and "dirty" works is the window block replacement. It is necessary to do this firstly due to the fact that dirt and dust will be unallowable during following stages and it is restricted at all to open windows during painting and wallpaper works (big drops of the temperature and wetness are unallowable). After mounting windows and windowsills it is essential to load them right away in polyethylene movie and to cover windowsills in addition by the fiber board (in order to avoid scratches).

The following phase is electrical wiring. Circuitry can be set up in walls or along the floor. Electrical wiring is made inside the pipelines to make sure electrical security and increase reliability. The pipeline secures wiring from external damages and allows to change the wire entirely without breaking walls and flooring simply by inserting the brand-new wire rather of the old one.

House Painting follows the circuitry. The regular error during the simultaneous conducting of such works occurs when workers forget to set out one of the cable televisions and home painters have currently plastered and ravelled the wall. As an outcome, extra works are required to seal chases after on the finished wall. The locations of the feed switch and wall outlet location and their number must be thought-out ahead of time. The scheme of power wiring is normally included into the design project.

Later on the system need to be all set to service in case of failures. In addition to the circuitries, the telephone cable and the television cable are set out. The power cable television ought to not read this be set out near the telephone and antenna cable televisions to avoid noise pickup and disturbance. The most peculiar moment is setting out the television cable television. In order to make 2 (or three) television set in the house the second cable is often simply "strongly soldered" in parallel, so the cable resistance is decreased. As an outcome, the screen quality is deteriorated, many programs can't be gotten and etc. In order to prevent such situation it is needed to invite an expert with unique devices. He will measure the signal level of the each TV-feeder and install TV-amplifiers or TV-filters.

Painting is the most long-term procedure, that is why it is conducted all at once in all facilities, if it is possible. Hold-ups are linked with the technology. Each applied layer of the plaster (or completing finishing) should dry totally before the work will continue.

Works in hygienic arrangements and the kitchen start all at once with home painting. It is much better to satisfy so-called "dirty" operate in the first place and all at once. In accordance with the plan of the sanitary service technician location welding, wall chasing and pipeline run are conducted. Steam radiator admissions are prepared, taps and brackets are installed, but radiators are not installed.

Then operates in hygienic arrangements are performed according to the strategy. The bath is mounted, then walls are smoothed out and the tile is laid on walls. The list below phase is assembling ceiling and laying tiles on the flooring. And at last other hygienic gadgets, mixers and devices are mounted.

After circuitry, installation of rosette plates and terminal boxes the voltage is checked in all point. Ends of wiring are insulated and set out into rosette plates. Sockets and breakers are not set up throughout this phase in order to conserve their surface appearance. The surface puttying of walls is performed at the same time. The highly precise control of drying of the layer of the plaster (filling) is performed by drymeter. It is an unique instrument that determines moisture of the material.

The following stage is the procedure of fill. Fill can be made with various products-- from normal masonry cement-sand mix to self-aligning floorings. The advantage of the easy mix is its cheapness, the disadvantage is that such mix is much more difficult lined up at the level and the last dry time of such fill is 40 days, just then the next stage of the work with floor can be performed, i.e. the period is too long. Self-leveling Check out this site self-aligning floorings are much more pricey, however more technological. Lining up takes place practically "instantly" i.e. fluid solution of mix is poured out, then it runs and you get the horizontal surface. The last dry time is 15 days i.e. you have considerable time economy. The system "warm floor" is installed into the fill. If the so-called "wet processes" are inapplicable the technology of the dry aligning (the fill technology) is used bases for floors with adjustable flooring battens are mounted.

After fill door boxes and door are set up. Installation of doors need to take into the account density of future floor covering. After installation the door can be removed its hinges and eliminated up until completion of repair or loaded into polyethylene movie to safeguard from damages. Simultaneously ceiling can be painted and the tile can be laid in that facilities where it was prepared. The tile needs to be laid on the absolutely dry overlay.

Finishing of the floor mounting depends upon the prepared covering. In many cases (if finish covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are repaired to the flooring by self-tapping screws. One plywood sheet is fixed by 30-50 self-tapping screws to offer the close repairing of plywood and long-lasting service of the flooring without squeak and bulging. The plywood offers the additional heat- and acoustic insulation. After mounting of the plywood is finished, wallpaper for painting can be pasted on walls.

image

In properties where surface covering of the floor is laminated floor covering or parquet hoard, the common wallpapers are pasted (not for painting) in the first place. Then the flooring covering is mounted.

If finish covering of the flooring is the block parquet, the parquet is laid in the first place, then it is scraped and covered by one layer of lacquer. After this the common wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending upon the quality of the parquet and lacquer). The pointed out effect is linked only with such rushing process when the great quantity of dust is developed. In spite of the fact that good floor grinders are geared up with the vacuum, the sufficient quantity of dust is precipitated on surrounding subjects including walls. Dust is really acerbic and is terribly cleaned off. That is why in order not to damage wallpapers, they are pasted after rushing and in order the parquet do not take in the surplus wetness it is covered by the one layer of lacquer before wallpaper pasting.

After this the main works can be considered to be finished. It is left only to install the plinths, decorative aspects, breakers and sockets, curtain holders, to hang doors, plant-bands and others.

In conclusion it is needed to note that the sequence of works was listed in basic and can change depending on the guaranteed circumstance-- the number of rooms in property, your resources, peculiarities of the building and construction of the multilevel facilities. It is based upon good sense and everyone capable of analysis can separately create such a sequence.